The project takes David roughly three months to finished (not continuous work).
Started from digging the area for the foundation and levelled the ground. Afterwards, decks then build.
Then, we let the water in the pond settled before we added fish (took us roughly six weeks).
This is the final result … the woods on the top of the pond are to protect the fish from the birds as well as to prevent algae growing rapidly